Detailed Planning
A feasibility study was carried out with the project plan and available data, and a search was made for an agency in Italy with suitable cross-dock warehouses. Warehouse areas suitable for the addresses where customer suppliers are concentrated were determined. On a regional basis, the operation transition was made gradually within 1 month, with Arkas Logistics being the control. Within 3 months, KPI reports were prepared with the available data. Considering the KPI reports, the points that need attention, the criteria that need attention and the stages that need to be corrected/changed were revealed. With the KPI reports, the areas where improvement was achieved on a monthly basis were displayed. KPI reports can be monitored instantly and information can be obtained with PowerBI.